My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1994 08 01
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1994
>
AG 1994 08 01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:32:56 PM
Creation date
11/27/2017 11:58:56 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/1/1994
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plans were distributed through HDR Engineering Inc. of North Carolina. In response <br />to the Advertisement for Bids, twenty-two (22) contractors and/or vendors requested and <br />received drawings and specifications. Three Contract S bids, five Contract A bids, no <br />Contract B bids, two Contract C bids, and five Contract L bids were received. <br /> <br />VI. SUMMARY OF BID OPENING: <br /> <br />All Contract L Bids were publicly opened and read aloud at the date, time, and place <br />specified. In accordance with NC GS 143-132 (b), the multi-prime bids could not be <br />opened because there were no Contract B - Mechanical and Plumbing Bids. However, <br />since there were three Contract S bids, these bids were opened and read aloud with the <br />intent to award on the basis of the lowest single prime bid. The submitted Contract A <br />and Contract C bids were returned to the bidders unopened. <br /> <br />The bids are listed below in the order in which they rank: <br /> <br />Contract Bidder Total Bid <br />S Concord Builders $1,235,000.00 <br />S Gilbert Engineering Company $1,318,667.00 <br />S Haren Construction $1,349,000.00 <br />A Concord Builders Not Opened <br />A Dellinger, Inc. Not Opened <br />A Haren Construction Not Opened <br />A Gilbert Engineering Not Opened <br />A Powell Constraction Not Opened <br />B No Bidders NA <br />C Watson Electric Not Opened <br />C Spence Electric Not Opened <br />L R.F. Shinn $794,935.50 <br />L Dellinger, Inc. $799,371~00 <br />L Gilbert Engineering Company $819,873.25 <br />L B.R.S., Inc. $891,600.45 <br /> Corrected <br />L Ramey, Inc. $ 1,259,494.50 <br /> <br />The above bids were examined for accuracy and compliance with bid requirements. The <br />Contract L bid of B.R.S., Inc. contained a minor math error of $0.70 which was <br />corrected to the figure presented above. The change did not affect the ranking of any <br />bidder. The Contract S bid of Concord Builders, Inc. contained a minor irregularity by <br />omitting the name of the manufacturer for the modular treatment units, They have <br />subsequently provided a letter indicating that Davco should have been written into the <br />space provided. <br /> <br />All bidders are licensed North Carolina contractors and each provided the required five <br />(5) percent bid bond. <br /> <br />2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.