Laserfiche WebLink
TASK 1 - RETAIN WELL INSTALLATION CONTRACTOR <br /> <br />Under this task, CDM will solicit and select a well installation contractor for the <br />installation of seven new monitor wells and thirteen gas monitoring wells around the <br />existing landfill, which will consist of the following subtasks: <br /> <br />Subtask 1.1 - Prepare Information and Data for Submittal to Drilling Contractors <br /> <br />CDM will prepare information and applicable site data, which will designate proposed <br />start/completion dates and the information necessary for the drilling firms to prepare their <br />bids. The data will then be sent to qualified drilling firms for bid submittal. <br /> <br />Subtask 1.2 - Review Bids <br /> <br />CDM will review the bids to ensure that the bidders understand the scope of work <br />required. Bids will then be reviewed by CDM, and a drilling firm selected. <br /> <br />Subtask 1.3 - Prepare Contract <br /> <br />Once a drilling firm is selected, CDM will then contract with the selected firm and <br />arrange for mobilization of the necessary equipment to the site. This task also includes <br />the review of subcontractor pay requests and other miscellaneous oversight items related <br />to the subcontractor. <br /> <br />TASK 2 - SUPERVISION OF MONITOR WELL INSTALLATION <br /> <br />Under this task, CDM will coordinate and supervise the monitor well installation. This <br />task will include the following subtasks: <br /> <br />Subtask 2.1 - Monitor Well Locations <br /> <br />Prior to mobilization of the drill rig, CDM will visit the site and stake the monitor well <br />locations. CDM will also coordinate with landfill staff for clearing access to the drilling <br />locations and setting up equipment storage and decontamination areas, as needed. <br /> <br />Subtask 2.2 - Supervision of Monitor Well Installation <br /> <br />Once a qualified drilling contractor is selected and mobilized to the site, CDM will <br />provide a qualified geologist to supervise installation of the seven new groundwater <br />monitoring wells and 13 methane gas wells in accordance with the "North Carolina Water <br />Quality Monitoring Guidance Document for Solid Waste Facilities", and applicable North <br />Carolina Well Construction Standards, 15 NCAC 2C .0100. This task includes estimated <br />drilling cost, based on anticipated linear footages. Cost information is provided in Item 4. <br />Actual drilling costs may vary. If drilling costs exceed this estimate, the County agrees to <br /> <br />n:',cabarms'.lmcnd6.cab 2 of 7 <br /> <br /> <br />