My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1994 10 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1994
>
AG 1994 10 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:34:02 PM
Creation date
11/27/2017 11:59:10 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
10/17/1994
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1) <br />2) <br />3) <br />4) <br />5) <br />6) <br /> <br />Regional Characterization Study <br />Local Characterization Study <br />Site Hydrogeologic Report <br />Location Restrictions <br />Local Government Approvals <br />Proposed Facility Plan <br /> <br />CDM will address both Option A and B for items 1 and 2 above since the additional effort to <br />cover both sites is minimal. CDM will conduct on-site subsurface investigations of both the <br />Option A and B sites. Due to the ground water flow concerns mentioned above for Option B, <br />CDM will begin the field work on Option A. Concurrently, additional ground water samples <br />will be taken from the monitoring wells on the existing landfill. Once these results are <br />available, CDM will meet with County staff to determine if the subsurface investigations <br />should proceed on to the Option B site. CDM will not initiate preparation of the final Site <br />Hydrogeologic Report until a decision is made between which of the two site options will be <br />selected for permitting. <br /> <br />CDM will evaluate both sites for compliance with the landfill location restrictions in item 4. <br />Once a final decision is made between Option A and B, CDM will assist Cabarrus County <br />with preparing the necessary local government approvals for the preferred site option. No <br />work will begin on the Facility Plan, item 6, until a preferred site option is selected. <br /> <br />The tasks that will be completed in support of preparation of the Site Study are outlined <br />below. <br /> <br />TASK 1 - REGIONAL CHARACTERIZATION STUDY <br /> <br />In accordance with Rule .1618 (c)(1), CDM will prepare a Regional Characterization Report <br />that covers both the Option A and B sites. The regional study area includes the landfill <br />facility and a two-mile perimeter measured from the proposed boundary of the landfill facility. <br />The study will include a report and a regional map identifying the following: <br /> <br />1) <br /> <br />General topography and features as illustrated on the most recent U.S.G.S. <br />topographic map, 7.5 minute series, horizontal scale of at least one inch equals <br />2000 feet; <br /> <br />2) Proposed landfill facility location; <br /> <br />3) Public water supply wells, surface water intakes, and service areas; <br /> <br />4) Residential subdivisions; <br /> <br />5) Waste transportation routes; and, <br /> <br />6) Public use airports and runways. <br /> <br />n:~ab armsMmend7.cab <br /> <br />Page 2 of 18 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.