Laserfiche WebLink
CABARRUS COUNTY LANDFILL DEVELOPMENT COSTS <br /> OPTION C - COUNTY ONLY <br /> 30 YEAR LIFE <br /> <br />I Land and Site DeveJop~enl: <br />Land ~ch~e Ac 6,~.~~ 1~ 9~,~ <br />Exc~aflon & Stockpiling CY 3.~ 841,42a 2,9~,970 <br />24' Recompacfed CI~ Uner $Y 14.~ 2~,28g 2,8~,920 <br />~ Mil HDPE Uner SY 5.40 2~,2~ 1,097,712 <br />Geonet W/Geote~ile Bonded 2 Sides SY 4.~ 203,2~J 914,760 <br />24" Protecfiv~ Cover Sand SY 14.~ 203,2~' 2,8~,920 <br />Leachate Piping ~ 25.~ 6,0~ 1~,~ <br />Roads SY 27.~ 22,293 601,911 <br />Stream Crowing LS 1~,~.~ 1~,~ <br />Contingency (25%) tS 3,11529~ <br />Subtotal Construction Cost $15,576~491 <br />Engineering Sewices (2~) LS $2,923298 <br />Tolal Up-Front Capilal Cosl $18,~99,790 $18,499,790 <br />Final CoverJClosur~ Ac 75,~.~ 42 3,1~ <br />Confingenqy (15%) LS 472,~ <br />Sublotal Construction Cost $3,6~,500 <br />Engineering SeNices (15%) LS ~,375 <br />Total Closur~ Capllal Cost $4,165~875 $560~714 <br /> <br />I-- G~and Tolal PW Capital Cost _ $19 0~ 5~ <br /> <br />-5- <br /> <br /> <br />