Laserfiche WebLink
CABARRUS COUNTY LANDFILL DEVELOP~!ENT COSTS <br />OPTION A - COUNTY PLUS 5,000 TPM <br />20 YEAR LIFE <br /> <br />Land and Site Development: <br />Land Purchase Ac 6,000.00! 192! 1,152,000 <br />Excavation & Stockpiling CY 2.25 3,462,000 7,789500 <br />24" Recompacted Clay Uner SY 12.00 338,800 4,065,600 <br />60 Mil HDPE Liner SY 5.40 338,800 .1,829 520 <br />Geonet W/G~otextile Bonded 2 Sides SY 4.50 ,338,800 ! ,524,600 <br />24" Protective Cover Sand SY 14.00 338,.800 4,743200, <br />Leachate Piping LF 25.00 9200 230,000J <br />Roads SY 27.00 31,000 837,000 <br />Stream Crossing LS 75,000,00 1 75,0C0 <br />Contingency (10%) LS 22.24,642 <br />Subtotal Construction Cost $24,471 ~062 <br />Engineering Services (10%) LS $2,331,906 <br />Total Up-Fr0.nt Capital Cost $26~802,968 $26,802,968 <br /> <br /> Final Cover/Closure: Ac I 75,000.00 70 5250,000 <br /> Contingency (15%) LSI 5&5,000 <br /> Subtotal Construction Cost $4,488~000 <br /> Engineering Services (15%) LS 672,750 <br /> Total Closuie Capital Cost $5,157~750 $1 ~344,347 <br /> Grand Total PW Capital Cost $28,147,315 <br /> <br />-7- <br /> <br /> <br />