Laserfiche WebLink
REZONING PETITION 93-02 <br />April 15, 1993 <br />Phil Cline, Petitioner <br /> <br /> Site access. The truck traffic safety question for this case hinges on the conditions of <br />access to the site. Mr. Cline has addressed this concern by constructing the entrance/exit to his <br />property in excess of Department of Transportation (DOT) minimum standards. DOT requires <br />50 feet; Mr. Cline has provided 75 feet. Additionally, outside of this 75' measurement is an <br />even broader turning area, allowing for more than ample space for turning. This excess space <br />permits a truck and trailer to remain out of the line of traffic while making turns into or out of <br />the site. The orientation of the property is such that an individual leaving the site has good <br />visibility traveling west and adequate visibility traveling east. A driver approaching the site <br />traveling west may be forced to a complete stop on the road while a truck attempts to cross <br />traffic to turn into the Cline facility. To promote traffic flow, it is recommended that a <br />continuous center turning lane be provided from Windrose Lane, the entrance to Windrose <br />subdivision, to the entrance of Phil Cline Trucking thereby allowing other vehicles to pass. <br /> <br /> Future land use. The rezoning request at issue would allow additional future land uses <br />with the potential to generate more traffic. The highest traffic generator of these would be <br />administrative and professional offices. The site has a maximum buildable area of 27 acres out <br />of the total 45. This translates into 270,000 square feet. Using the Institute of Traffic <br />Engineers (ITE) calculations of 4.4 employees per 1000 square feet, with a weekday trip rate <br />of 3.01, the site has the potential of generating about 3,564 additional dally trips. The maximum <br />build-out is believed to be highly unlikely due to the topography, floodplain and surrounding <br />land uses to the site. However, it is still recognized that the allowable land uses under the <br />requested rezoning are likely to generate enough additional traffic over time to warrant the <br />following recommendations. <br /> <br />Recommendations: <br /> <br /> 1) Center turn lane. The existing center turn lane should be extended from Windrose <br />Subdivision to the entry of the Cline property. This will improve the traffic flow with the <br />current traffic conditions and is recommended to be provided as soon as possible. <br /> <br /> 2) Deceleration lanes. A deceleration lane approaching from the west should be <br />considered at a later point in time, in all probability, at the time of the proposed widening to <br />four lanes. Traffic from the east will be served by the recommended center turn lane mentioned <br />above which will function as a deceleration lane in addition to a center turn lane. <br /> <br /> 3) Site access. Access should be limited to one entrance/exit due to both the current and <br />projected traffic flow on Highway 49 and because of its classification as a principle arterial road. <br />However, it need not be necessary that the access remain in the same location. <br /> <br />These recommendations will go immediately to the North Carolina Highway Department <br /> <br /> <br />