My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 1992 01 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1992
>
AG 1992 01 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2002 4:08:47 PM
Creation date
11/27/2017 12:00:59 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/21/1992
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. John Witherspoon <br />January 9, 1992 <br />Page 3 <br /> <br />priority list of readily achievable modifications as well as a long range Barrier Removal Plan. <br />Our staff will also be available to assist with recommendations. <br /> <br />We estimate that the cost of Centralina providing all services will be $16,560, including the <br />use of a 40-free-hour block allocated to the county. Our estimate is based on the inspections <br />and write-up of 32 buildings or facilities (using the 20 technical elements recommended by <br />ADA), interviewing personnel to determine areas of accessibility and compiling cost estimates <br />for modifications. This also includes the revision of each job description used by the County, <br />drafting or modifying operating procedures, and revising administrative functions related to <br />the i.nterviewing and hiring process. <br /> <br />An alternative cost estimate would delegate most of the personnel work to County staff <br />members and would use Centralina staff in a training and advisory capacity. This would <br />reduce the cost of the project to $11,760 plus the 40-free-hours. <br /> <br />Centralina staff members James Luster and I will be administering this project. James is a <br />Planner, Certified Building Inspector and very familiar with the State building code including <br />handicap accessibility. While at Centralina James has administered several CDBG Projects, <br />served as Housing and Building Code Administrator for several member governments and has <br />worked with the Airport relocation project with the City of Charlotte. <br /> <br />Projects which I have undertaken while at Centralina include the drafting of several personnel <br />ordinances for cities and counties and the preparation of position classification plans including <br />the current plan for Cabarrus County. I have also assisted on some CDBG projects and <br />worked with the Airport relocation project. <br /> <br />We are confident that Centralina will provide you with a useful product and are anxious to <br />begin work on this project. If you have any questions regarding this proposal, please do not <br />hesitate to contact either James or me. <br /> <br />Sincerely, <br /> <br />Robert A. Henderson <br />Management Analyst <br /> <br />CC: <br /> <br />Steve Little, Recreation Director <br />Lee Armour, Executive Director <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.