My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19890713
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1989
>
AG19890713
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:25 AM
Creation date
11/27/2017 12:06:49 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
7/13/1989
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Advise the Owner of any adjustment of the cost estimate of <br /> the project caused by changes in scope, design, requirements <br /> or increased construction costs. <br /> <br /> 3. Furnish required sets of plans and specifications for use by <br /> Owner, regulatory agencies and Contractors. (Cabarrus County <br /> printing machine and paper will be used to keep costs down.) <br /> <br /> 4. Provide assistance in advertising for bids, securing a list <br /> of qualified bidders for the project, taking bids and <br /> advising the Owner as to the best bids to accept. <br /> <br /> 5. Prepare formal Contract documents for award of contract. <br /> <br />The Plans and specifications phase will terminate with the <br />evaluating of bids, negotiating of proposals and preparing <br />construction contracts. <br /> <br />For these services, the Engineer is to be paid by the Owner as <br />indicated in Part IV, Number <br /> <br /> Part III - Enginee__ring Services durin~tion <br /> (if desired) <br /> <br /> After the awarding of construction contracts and upon written <br /> request from the Owner, the Engineer will provide part-time <br /> engineering services during construction. These services will <br /> include the following: <br /> <br />1. Observation of the work performed by the Contractor 'to 'assure <br /> compliance with the plans and specifications and receiving <br /> first-class workmanship and materials. (See Item 8) <br /> <br />2. Preparation of monthly construction cost estimates for use as <br /> a basis for payment to the Contractor. (See Item 8) <br /> <br /> Keep Owner fully informed as to the progress of the ~ork and <br /> status of the project. <br /> <br />4. Issue instructions of the Owner to the Contractor and prepare <br /> Change Orders. <br /> <br />5, Provide assistance in tune-up and testing equipment. <br /> <br />6. Provide liaison between Owner, regulator), agencies and the <br /> Contractor. <br /> <br />7. Final inspection and certification of the project, including <br /> one set of blue line "Construction Record Drawings". (See <br /> Item 8 ) <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.