Laserfiche WebLink
8. A full-time resident for construction observation should be <br /> furnished by Owner and should serve under the Utility <br /> Department. <br /> <br />The Engineer shall not be responsible for the acts or omissions <br />of the Contractor, any Sub-contractor, or any of the Contractor's <br />or Sub-contractor's agents or employees, or any other persons <br />performing any of the work under the construction contract. <br /> <br />For these services, the Engineer will be paid by the Owner at the <br />hourly rates indicated in Part IV, Number 9. <br /> <br />Part IV - Miscellaneous Enoineerin9 Services <br /> <br />In addition to the foregoing services, other special services may <br />be performed when requested by the Owner: <br /> <br />t. The testing of materials such as concrete, reinforcing steel, <br /> soil testing, flow gauging or sewage analyses as these are <br /> services rendered by commercial laboratories, or <br /> <br />2. The establishing of property corners, topographical surveys, <br /> rights-of-way or property surveys, since these services <br /> should be rendered by a duly authorized local land surveyor, <br /> <br />3. The preparation of Operation and Maintenance Manuals for any <br /> necessary pumping facilities. <br /> <br />4. The Engzneer will advise the Owner of the need for any of <br /> these services and assist the Owner in obtaining these <br /> services. Billing to the Owner by the Engineer for professional <br /> services of consultants will be the cost of these consultants <br /> to the Engineer multiplied by the factor of 1.15. <br /> <br />5. Necessary filing of maps for water rights, special documents, <br /> court work for water adjudications, litigation or other <br /> reasons shall be done by the Engineer if requested by the <br /> Owner. Payment for these shall be based on direct personnel <br /> expenses plus direct reimbursable expenses at cost. <br /> <br />6. For servzces in preparing documents and drawings for <br /> alternate bids requested by the Owner for work which is not <br /> <br />7. For redesign done by the Engineer at the request 6f the Owner <br /> after receiving the approval of preliminary plans, the <br /> Engineer will be paid a fee based on the hourly rates as shown <br /> in Number 9. <br /> <br />8. For services during readvertisement for bids for <br /> construction, the Engineer will receive reimbursement based <br /> on the rates as shown in Number 9. <br /> I <br /> <br /> <br />