Laserfiche WebLink
the sedimentation basin. The specifications will be prepared in <br /> Construction Standards Institute (CSI) format. <br /> <br /> Task 4.0 - Draft submittal <br /> <br /> ENGINEER shall submit five copies of the draft design and <br /> specifications to OWNER for review and cogent. <br /> <br /> Task 5.0 - DNR® Submittal <br /> <br /> ENGINEER will submit three copies of the final report to DNRCD for <br /> review. ENGINEER will address comments from DNRCD and incorporate them <br /> as necessary. <br /> <br />Task 6.0 - Final Submittal <br /> <br /> ENGINEER will submit one set of final original technical specifications <br /> and drawings to OWNER for incorporation into bid documents completed by <br /> OWNER. <br /> <br />Task 7.0 - Services During Construction <br /> <br /> ENGINEER will Coordinate with soils engineer retained to provide <br /> testing sekwices during construction by OWNER. ENGINEER will n~et once <br /> with soils engineer during initial planning stages of construction and <br /> once during actual construction to observe construction of the basin <br /> and make reco~m~endations as appropriate. <br /> <br />Out of Sco~e WOrk <br /> <br />The f~llowing tasks are not included in the E~INEER's lump sum price and <br />therefore, if requested by the County, must be scoped, priced, and <br />authorized by an amendment to this Agreement. <br /> <br /> o Geotechnical testing and inspection services during construction. <br /> CDM will coordinate with the geotechnical engineer to start <br /> <br /> 3of5 <br /> <br /> <br />