My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19880104
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1988
>
AG19880104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:19 AM
Creation date
11/27/2017 12:07:38 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/4/1988
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The applicant also agrees to furnish prior written notice to <br />the County Engineer as to the exact data construction will <br />begin, and fur thor agrees to furnish the County Engineer <br />every reasonable facility to ascertain whether or not the <br />work as performed is in accordance with the approved <br />drawings and specifications. It is understood and agreed <br />that Inspectors employed by the County shali be stationed at <br />the work to report as to (he progress and performance of the <br />work, and shall be authorized to inspect any part of the <br />work done and material furnished, including its preparation <br />or manufacture. No sewer pipe or other appurtenance shell <br />be placed except in the presence of the County Engineer or <br />his authorized inspectors without special permission. Such <br />inspections, however, shall not relieve the Applicant from <br />any obligation to perform ell of the work strictly in <br />accordance with the Specifications. In the case of diaputes <br />arising as to the materials furnished or the manner of <br />performing the work, the County Engineer .shall have the <br />authority to reject materials or suepend work until the <br />question at issue can be resolved, it is further understood <br />end agreed that the Applicant shall remove any work or <br />materials condemned as unsatiefactory by the County Engineer <br />and shall rebuild end replace same to the standard required <br />by the specifications, ell at hie own expense and in default <br />thereof, the same may be done by the County and the coat <br />charged against the Applicant. Final connection to the <br />County's sanitary sewerage system will not be permitted <br />until all work has been approved by the County Engineer and <br />any applicable fees or charges paid. <br /> <br />6. It is understood and agreed that the Applicant and <br />other parties may discharge sewage into the proposed line or <br />lines only under and ia accordance with the standard rules <br />and regulations of the County Sewer Use Policy. Such <br />obligation shall include the applicant providing the County <br />with the name and address of each user of the sewer system <br />and informing any such users of the obligation of ail usual <br />fees and charges including security deposits and monthly <br />user tees. Fees collected shall be paid directly to the <br />County by the individual users of Ihe system. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.