My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19880118
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1988
>
AG19880118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:19 AM
Creation date
11/27/2017 12:07:42 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/18/1988
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Charles McGinnis <br /> Page 2 <br /> January 13, 1988 <br /> <br /> After approval of the downtown site, our next step was to <br /> develop a comprehensive program of which the quality, type of <br /> functions, and square footage required for this facility <br /> would be established. At the completion of this program, the <br /> Commissioners were informed that the programmatic study <br /> suggested that approximately 76,000 ~.f. of building would be <br /> required to house the needs of 'the County Administrative <br /> Offices and various departments that would occupy this <br /> building until year 2010. In addition, because of the <br /> characteristics of this site, two levels of underground <br /> parking were developed to offset parking which was removed by <br /> the construction of this facility. This facility has been <br /> ultimately designed to accommodate the following departments <br /> and offices: <br /> <br />o County Commission Chambers <br />o County Manager- <br />o County Finance Director <br />o County Engineer <br />o County Planner <br />o Zoning Administrator <br />o Building Inspector <br />o Register of Deeds <br />o Tax Collector <br />o Tax Supervisor <br />o Land Records and Cartography <br />o Micrographics <br />o Data Processing <br />o Home Health Care <br /> <br />During the last 12 months, we have proceeded with the design <br />of this facility based on approval of this program by the <br />various department heads and managers. The final building <br />and project design has the following characteristics: <br /> <br />o The building has a 70 percent efficiency ratio of net <br /> s.f. to gross s.f. and has approximately 72,529 gross <br /> s.f. This square footage is housed in two above-grade <br /> levels which are accessed by pedestrians from Church <br /> Street and by vehicles from the parking decks below. <br /> Approximately 16,240 s.f. of this amount is located in <br /> the lowest level parking garage, which is accessed from <br /> the building above through elevators, etc., as well as a <br /> vehicular access from McCachern Boulevard. <br /> <br />o The building has provisions for 169 parking spaces which <br /> are on two underground levels. The main public parking <br /> level is accessed from Means Avenue and will contain <br /> approximately 105 parking spaces. In addition, future <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.