My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19880118
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1988
>
AG19880118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:14:19 AM
Creation date
11/27/2017 12:07:42 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/18/1988
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section B - Sewe~ Lfne Construction <br /> <br /> 1) As provided by state laws and regulations the-Cit~-agrees to <br /> develop and implement a state approved program of Permitting <br /> construction~ modification~ and operation of public and private sewer <br /> systems in the Rocky River Regional Wastewater Treatment Plant service <br /> areas. (Reference G.S. 143-215.1 (f) and Rule 15 NCAC 2H 0.0218). <br /> <br /> 2) The County and the City agree to carry out the terms and <br /> conditions of the state approved sewer system permitting program. The <br /> approved program shall be oonsigered a part of this agreement. <br /> <br /> 3) rrlor to the County~entering~nto a eontra~t or giving permission <br /> for the construction and Connection o{~ny sewer lines or sewer line <br /> extensions or modification the.G~shall have it's professional <br /> engineer (staff or consultant) who is licensed bo practice in North <br /> Carolina perform the folloWing as specified in the approved sewer <br /> system program: ~ <br /> <br /> a) A review of the pla~s aud specifications for all public <br />' projects contracted by the~County and all private projects which <br /> proposed to connect to the~County's eolleetion~ outfall~ and/or <br /> interceptor system; <br /> <br /> b) Summarize the criteria used in t~e design on forms furnished <br /> <br /> --o-)~ Prov-ide-a-oept~-f~[~n that all design specifications ape <br /> east-.as~ br fngen~ mi nim um~ p e e l-fi~t-i~n-s--e'o n Ea'ln'e d -i~t h~ <br /> pp~ewe~ysbem~rog~ <br /> <br /> d) Bemfomm-at -~ east-one- on-site--ihNpee tion~-- dur lng~-const ~ue tion, <br /> for. comp 1 ianc~ea-eh-per mi-t~e.~o0 ec t- and~-submit-a ~wr~f t ten <br /> Construcg~on Inspection-Report of hxs fin~i~g go gHe Clty;'~ <br /> <br /> No ~f~t he= ~ ft~OT~t h'~--d~'~g~ t- t he--l-f ne -wi 1 l_be_comp le_Led~ <br /> <br /> T H ~_t e s t-- s ~e ~= '~-~Td~'~'i-~ ~ .-. a ~ ~, ~ a nd ~ i n Ci ~t r a tion ~]~][~i 1~- be <br /> <br /> ~ Prior to,the project b~ing utilized provide a written <br /> cerCification~hat the permitted project has been constructed in <br /> accordance with the design plan'~a~d~s~e~ea~ons,, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.