My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG19790709
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
1979
>
AG19790709
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2003 9:13:19 AM
Creation date
11/27/2017 12:16:56 PM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
7/9/1979
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Right to Use of Sewer Line. <br /> The Cottnty and the Board hereby grant to Indust~y the right <br /> to use that certain presently existing sewer line (hereinafter <br /> referred to as the "existing sewer line") which terminates at or <br /> near ~he County Public Health Building located at the inter- <br /> section of Cubarrus Avenue West a~d Highway 601 Bypass in <br /> Cabarrus, North Carolina. The ,exact location of the ex~sting <br /> sewer line is more particularly described in that certain Lease <br /> Agreement between the County and the Board dated January 21, <br />- _ 1977, which is attached hereto as Exhibit A and incorporated <br /> herein by reference. <br /> The Board and Industry have previously reached agreements <br /> concerning the const~ction of a new sewer connector line (here- <br /> inafter referred to as the "sewer connector line") which will <br /> extend fro~ Industry~s property at Union Cemetery Road across <br /> other intervening lands to the location of the existing sewer <br /> line on the County's property. Industry has agreed to fund the <br /> engineering and construction of t~he sewer connector line, and the <br /> Board has agreed to obtain the necessary rights-of-way and <br /> operate and maintain the sewer co~nector line after it is <br /> installed. No other parties shall have the :-[ght to use the <br /> sewer cor~nec~or line without the express written consent of <br /> Industry. The previous agreements between the Board and Indusr~ <br /> ~re hereby ~atified. <br /> 2~ ~Rules for Use of Lines. <br /> The existing sewer line shall he intersected and tapped by <br /> the sewer connector line at such exact location as the engineers <br /> for the Board and ]ndus~ shall m6tually determine. The use Of <br /> both the existing sewer line and the sewer connector line shall <br /> be governed by the regular rules of the Board as the operator of <br /> such lines. In planning the use of the existing sewer line, the <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.