Laserfiche WebLink
parties have contemplated that the existing sewer line's capacity <br />of 300,000 gallons per day of waste water effluent. It is <br /> <br />either by (i) the County, with respect to its currently existing <br />and future County owned facilities located in the area of the <br />intersection of Cabarrus Avenue West with the Highway O01 Bypass, <br />or (ii) those individual customers presently having rights to tap <br /> <br />Ey~ibit A. <br /> <br />preempting the capacity of the line by Industry. Subject to the <br />use of the existing sewer line by the County and by the indi- <br />vidual customers presently having rights in such line, Industry <br /> <br />.specified herein. <br /> <br /> 3. F~ont Footage Char~. <br /> <br />the rate of $3.50 per front foot. Therefore, at the time the <br />tap-on to the existing sewer line is installed and used, Industry <br />shall pay to the County, an amount equal to the front footage of <br />Industry's property measured along Union Cemetery Road (1,834.84 <br />feet) multiplied by the stated front footage charge ($3.50) <br />yielding a total due o£ $6,422.00. <br /> <br /> <br />