Laserfiche WebLink
156 <br /> <br /> Mr. T. L. Patterson, District Engineer of the North Carolina Department <br />of Transportation, reviewed the procedure for adding roads to the state <br />secondary road system for maintenance and the process for paving roads <br />under the Property Owners Participation Program. In addition, Mr. Patterson <br />asked that the Board revise the 1982-83 Cabarrus County Secondary Construction <br />and Bond Program in order to correct the amount of the 1981-82 Bond Funds <br />and to transfer all funds proposed for the spot stabilization program to <br />the pavement widening project for which the State had overspent previously <br />allocated funds. <br /> UPON MOTION of Commissioner Cook, seconded by Commissioner Lentz and <br />unanimously carried, the Board approved the addition of Twinkle Drive to <br />the state secondary road system for maintenance. <br /> UPON MOTION of Commissioner Nash, seconded by Commissioner Lentz and <br />unanimously carried, the Board by resolution approved the request as contained <br />in the letter from Mr. T. L. Patterson, District Engineer with the North <br />Carolina Department of Transportation, to correct the balance of the 1981-82 <br />Bond Funds as shown in the 1982-83 Secondary Road Construction and Bond <br />Program from $89,659.00 to $23,707.06 and to transfer all funds totaling <br />$49,903.00 previously allocated for the spot stabilization of secondary <br />roads to the pavement widening project. The revised 1982-83 Cabarrus <br />County Construction Program is as follows. <br /> <br />BALANCE 1981-82 SECONDARY <br />BALANCE 1981-82 BOND <br />ALLOCATED 1982-83 SECONDARY <br />ALLOCATED 1982-83 BOND <br /> TOTAL AVAILABLE 1982-83 <br />RESERVE 25% PROPERTY OWNERS PARTICIPATION <br /> ADDITIONS AND CONTINGENCIES <br />RESERVE 15% 1982-83 FUNDS FOR SPOT <br /> STABILIZATION <br />RESERVE 20% PAVEMENT IMPROVEMENTS <br />UNPAVED <br /> <br />$ 61,709.89 <br />23,707.06 <br />270,699.00 <br />65~962.00 <br />$ 422,077.95 <br />$ 105,519.49 <br /> <br />50,499.15 <br /> <br />84,415.59 <br />181,643.72 <br /> <br />PROPOSED PROJECTS <br /> <br />0% Spot Stabilization <br /> <br />$ 0.00 <br /> <br />Project No. 1, Pr. No. 4 <br />SR 2455, Cranford Road, Grade, Drain, Base, Pave, <br />Seed and Pavement markings. From SR 2450 to <br />SR 2457. Length 2.30 miles. <br /> <br />$ 175,692.00 <br /> <br />Project No. 2 <br />Widen SR 2444, Cruse Road, From an existing <br />16' pavement to a 22' pavement, From SR 2453 <br />to the Rowan County Line. Length 2.66 miles. <br /> <br />$ 134,914.74 <br /> <br />Project No. 3 <br />SR 1857, Blue Ridge Street, Grade, Drain, Base, <br />Pave and Seed, From SR 1867 to SR 1857. <br />Length 1,306'-0.25 mile. <br /> <br />$ 12,598.89 <br /> <br />Project No. 4 <br />SR 1376, Dulin Avenue, Grade, Drain, Base, <br />Pave and Seed, From SR 1335 to SR 1375. <br />Length 1,135.60' - 0.21 mile. <br /> <br />$ 13,999.89 <br /> <br />Project No. 5 <br />SR 1223, Appaloosa Lane, Grade, Drain, Base, <br />Pave and Seed, From SR 1168 to a Dead End. <br />Length 2,484.61' - 0.47 mile. <br /> <br />$ 23,645.43 <br /> <br /> Chairman Bonds stated that this was the day and hour scheduled for <br />a public hearing for two road name changes and asked if anyone were <br />present who wished to speak for or against these road name changes. No <br />one was present regarding these road name changes. <br /> UPON ~TION of Commissioner Nash, seconded by Commissioner Cook and <br />unanimously carried, the Board denied the naming of an unnamed road as <br />Poor Land Farm Road and referred the matter back to the Planning Department <br />for the selection of a more suitable name. <br /> <br /> <br />