Laserfiche WebLink
159 <br /> <br />11. <br /> <br /> companies as required. Current prices as bid by Concord <br /> Engineering and Surveying, Inc. on May 10, 1989 will <br /> remain in effect until December 31, 1989, and are as <br /> follows: <br />Water Line Location $0.35 LF <br />Sanitary Sewer Survey with Profile $0.42 LF <br />Right of Way Surveys with Maps $0.38 LF <br />For the design of sewage pump stations, water booster <br />stations, elevated tanks, etc., the amount paid will be on an <br />hourly rate as indicated in Number 9. <br />For preparing application forms and completing supporting data <br />for federal, state or local agencies, reviewing plans for new <br />subdivisions, approving Letters of Credit for developers, and <br />performing the general duties of the County Engineer, the <br />Engineer will be paid by the Owner based on the rates listed <br />in Number 9. <br /> <br />Part V - General Conditions <br />All invoices for engineering services will be due within thirty (30) <br />days after the date of the invoice and no part shall be withheld on <br />account of delays or performance of Contractor, or to cover the cost <br />of work not specified but which the Owner may consider necessary or <br />desirable. <br /> <br />The Owner will provide such legal, accounting and insurance <br />counseling services as may be required for the project. <br /> <br />In accepting this Proposal, the Owner accepts all parts thereof, but <br />performance of each part shall be initiated as directed by the Owner <br />in writing for each miscellaneous' project. <br /> <br />The plans and specifications will be completed by the Engineer <br />within a reasonable time. If the Owner wishes to terminate this <br />contract before final plans and specifications are completed, the <br />Owner must inform the Engineer in writing to terminate all work on <br />project. The Owner will pay the Engineer on an hourly basis for all <br />work completed. <br /> <br />Since the Engineer has no control over the cost of labor, materials <br />or equipment, or over the ContractorVs methods of determining <br />prices, or over competitive bidding or market conditions, the <br />estimates of construction cost provided for herein are to be made <br />on the basis of his experience and qualifications and represent his <br />best judgment as a design professional familiar with the <br />construction industry, but the Engineer cannot and does not <br />guarantee that bids or the project construction cost will not vary <br />from cost estimates prepared by him. <br /> <br /> TO THE FULLEST EXTENT PERMITTED BYLAW, THE TOTAL PROFESSIONAL <br />LIABILITY IN THE AGGREGATE, OF ENGINEER AND ENGINEERtS OFFICERS, <br />DIRECTORS, EMPLOYEES, AGENTS AND INDEPENDENT PROFESSIONAL ASSOCIATES <br />AND CONSULTANTS, AND ANY OF THEM, TO OWNER AND ANYONE CLAIMING BY, <br />THROUGH OR UNDER OWNER, FOR ANY AND ALL INJURIES, CLAIMS, LOSSES, <br />SERVICES, THE PROJECT OR THIS AGREEMENT FROM ANY CAUSE OR CAUSES <br />WHATSOEVER, INCLUDING BUT NOT LIMITED TO, THE NEGLIGENCE ERRORS, <br />OMISSIONS, STRICT LIABILITY OR BREACH OF CONTRACT OF ENGINEER OR <br />ENGINEERVS OFFICERS, DIRECTORS, EMPLOYEES, AGENTS, OR INDEPENDENT <br />PROFESSIONAL ASSOCIATES OR CONSULTANTS, OR ANY OF THEM SHALL NOT <br />EXCEED THE TOTAL AMOUNT OF $250,000.00. <br /> <br />ACCEPTED BY OWNER <br /> <br />/s/ James W. Lentz <br /> <br />James W. Lentz, Chairman <br />Cabarrus County Commissioners <br /> <br />ACCEPTED BY ENGINEER <br />/s/ W. E, Cochran, Jr. <br /> W.E. Cochran, Jr., President <br /> W. Earl Cochran & Son., Inc. <br /> <br /> UPON MOTION of Commissioner Hamby, seconded by Commissioner Melvin and <br />unanimously carried, the Board approved the Bibliographic Products and Services <br />Agreement between Southeastern Library Network, Inc. (Solinet) and the Cabarrus <br />County Library Processing Center to provide for the cataloging of library <br /> <br /> <br />