September 19, 2011 (Regular Meeting) Page 593
<br />H. Jay White, Sr., Chairman
<br />Board of Commissioners
<br />INFORMAL PUBLIC COMMENTS
<br />Chairman White opened the meeting for Informal Public Comments at 6:44
<br />p.m. He stated each speaker would be limited to three minutes.
<br />Marie Tucker, resident of 5213 Ellie Court in Concord, addressed the
<br />2012 property tax revaluation. Being a real estate broker familiar with the
<br />planning and revaluation process, she pointed out there is a difference in
<br />certified appraisers and county appraisers and asked the Board to be fair.
<br />Marilyn Barnhardt, resident of 5800 Walbash Lane in Concord, addressed
<br />the 2012 property tax revaluation by questioning a significant increase in
<br />value of her 25- year -old double -wide mobile home on approximately 0.71 acres
<br />in the Farm Hill neighborhood in Kannapolis. She reported her property was
<br />appraised in 2004 at $48,000.00 which increased to $124,000.00 in 2008.
<br />Further, she advised that trash pick -up is the only city service she receives
<br />despite paying city taxes for 12 years and noted the abundance of rental
<br />property in Farm Hill. She asked that these factors be taken into
<br />consideration during the upcoming revaluation.
<br />Thomas Barnhardt, resident of 5800 Walbash Lane in Concord, addressed
<br />the 2012 property tax revaluation. He advised it is unfair to give an old
<br />double -wide mobile home the same value as a stick -built home, of the same
<br />size, that was sold nearby.
<br />Jason Oesterreich, resident of 800 Towncreek Place in Concord,
<br />presented a comparison of the S &P Case Shiller Index to the county base rate
<br />for single family residential homes for the 2012 property tax revaluation.
<br />With there being no one else to address the Board, Chairman White
<br />closed that portion of the meeting.
<br />(E) OLD BUSINESS
<br />(E -1) County Manager - Update on CCS and KCS QSCB (Qualified School
<br />Construction Bonds) Projects
<br />Len Whtke, Cabarrus County Schools, reviewed the following list of QSCB
<br />(Qualified School Construction Bonds) Projects for Cabarrus County Schools
<br />(CCS) :
<br />Report on QSCB Funded Project Status (as of August 26, 2011)
<br />Ann P.1W
<br />Load Consulum
<br />Nu9 .W
<br />C...trvcrbn
<br />Actual Old
<br />T1111
<br />Project Anticipal.d
<br />Construction
<br />School
<br />ProJact Did... au.
<br />13.0plln.
<br />Adra n Foos
<br />AIE Fenn
<br />Budget
<br />4i noun!
<br />Dlfhrnnw
<br />Dodgot Bid Diu.
<br />Compt,uon Projett 5u[us
<br />Architectural
<br />Deverly Hias Eire. —I
<br />Replace Wrnd —nFew Cle"ni.ms
<br />Arehdeelilml
<br />$1,030
<br />511,053
<br />537,027
<br />556.600
<br />428.E53 S
<br />50,000 61232011
<br />81182011 Construction
<br />Cowan. Video Elementary
<br />Remodel for Nldgnot School Program
<br />Ardnleewlal
<br />53,030
<br />$22,105
<br />$124.895
<br />551,125
<br />$73.770 S
<br />150,030 61232011
<br />811812011 Construction
<br />Central CaOanus High
<br />Replacement Windows S Doors
<br />Ardlitect al
<br />570.500
<br />546.842
<br />5407,658
<br />S
<br />525,000 Fall 2011
<br />W152012 Prelim. de54gn- Pna'ed work
<br />Central Cabarrus High
<br />Office Renovation B New Entry Vest
<br />Architoctural
<br />$3.030
<br />S25.ODD
<br />$122.000
<br />S
<br />150,000 Fall 2011
<br />12/302011 Prellmmery It n:Jgn
<br />Concord High School
<br />Reptaw Chillcts & Controls
<br />Anclul0C 1
<br />S17,910
<br />566.500
<br />Sell ' D41
<br />$
<br />895.451 LVinler 2011
<br />8/152012 Prelim. JL- IpI.contrals in 2012
<br />Concord High School
<br />Omiag Room Adddion
<br />Archito.wtil
<br />510,000
<br />S44,3DO
<br />5445,700
<br />S
<br />500,000 Waltar2011
<br />8!752012 Preliminary d-118r.
<br />Concert high SChoal
<br />1Narghl Room Addition and Remodel
<br />Architectural
<br />$2,000
<br />S8.50D
<br />568,500
<br />S
<br />100,000 Spring 2012
<br />8 Prcllm4 ryd.isr.
<br />Concord High School
<br />Vocetienm Bulidmg Remodeling
<br />ArchRactu21
<br />53,000
<br />S13.500
<br />$133,500
<br />S
<br />150,000 Spring 2012
<br />8117,72012 Preliminary ocsign
<br />Concert High sweet
<br />Auditorium Improvements
<br />Architectural
<br />$3.500
<br />S15,48D
<br />5156.020
<br />S
<br />175,000 Winter2011
<br />&152012 Preliminary d ign
<br />Nontrwesi Cabo us High
<br />Pmaw Athletic Fields & Buildings
<br />Arch6eotti al
<br />$12,000
<br />S47,6DO
<br />$540,400
<br />5
<br />GOO.DD3 F3112011
<br />&15:2012 Construction documents
<br />Northwest CaCnmrs High
<br />Replace Chillers & Controls
<br />Archaeewral
<br />$13,920
<br />551.600
<br />553D,651
<br />S
<br />690,171 Wmtor2011
<br />80152012 Prelim. desipA- controls In 2012
<br />Northwest Callamus High
<br />UpgI.J. Entrance Canopy& Senirty
<br />Arch,t -I. al
<br />53,500
<br />515.480
<br />S156.020
<br />S
<br />175.000 Spring 2012
<br />6/1512012 Prellminary design
<br />Norhw•esl Cabanus high
<br />Gym Aodition
<br />Areh,tocW:ol
<br />S30.00D
<br />5128.800
<br />$1,3412DO
<br />S
<br />1,500,000 Spring 2012
<br />t2Z304012 Preliminary design
<br />PLC - J.N_F.- Melate
<br />Remodel One VAng for PLC PlogrOm
<br />Architeclura%
<br />52,000
<br />524400
<br />S1718D0
<br />$144,904
<br />5200.36 S
<br />200,000 7/19,7011
<br />54302011 Construction
<br />Subtotal
<br />3117.33D
<br />5522.160
<br />55,227.132
<br />$
<br />5,866,622
<br />Mechanical. EtpUriwl and
<br />Plumbing Engineering
<br />Beverly Hill. Elementary
<br />Replica ChMors & Cotirds
<br />Morn —al
<br />$6,650
<br />$14,250
<br />S31 t 856
<br />$
<br />332.556 W,nia12011
<br />8/152012 Prelim. dn[gn-mntrals In 2012
<br />Central Cabamts High
<br />Rep]— t21Qe¢ E Contras
<br />Idediartcal
<br />513.520
<br />534250
<br />5528.393
<br />s
<br />678.163 V /mi0r 2011
<br />8/152072 Prelim. design- wntrols in 2012
<br />Central CaWrNS High
<br />FJ tf' a: Vault Code Upgrades
<br />Elactr -1
<br />S4.500
<br />S29,003
<br />$191.500
<br />S
<br />225,006 Spring 2012
<br />97152012 Presminaryd —Gn
<br />IA Pleasant Elementary
<br />%IC System Replacement
<br />S4coh—oal
<br />515.720
<br />$30,250
<br />5739.987
<br />5
<br />785.957 Spring 2012
<br />8/15/2012 Prelnnlnury oc gn
<br />I'dt Pleasant High School
<br />New Bol'ers
<br />Meenanldal
<br />$1,760
<br />$5.270
<br />556470
<br />$
<br />63,033 Spring 21112
<br />81152012 Prellmmary desw8n
<br />Ml. Pleasant Middle School
<br />Replace Chdlm4 & Controls
<br />Medlamcal
<br />$9.520
<br />518,250
<br />$448.246
<br />S
<br />476,018 Winer 2011
<br />WISOO12 Prelim. d— C— onvols In 2012
<br />Nonhwos4 Cab3rrus h9/ale
<br />Replace Heat Pumps m 6th Grade VJi.
<br />Moore —1
<br />54.530
<br />574,1703
<br />5208.165
<br />S
<br />226,895 4292011
<br />8152012 Cans tructicn documems
<br />Vanaus Sersols- ah akor
<br />el.= l Pan. Testing and Corned— plus
<br />'
<br />P4ndl
<br />Smocy Equ,Pmmt
<br />Elacincal
<br />57,520
<br />537,000
<br />S33t,326
<br />S
<br />375,846
<br />$03,220
<br />5182,270
<br />52.915,745
<br />S
<br />3,161,235
<br />Subtotal
<br />Roof Replacam.nt
<br />J N. Fries Middle School
<br />Partial Roof Rep'acement
<br />Root Spoc'xldst
<br />S441DI0
<br />$13,225
<br />5202.315
<br />5
<br />20.000 Fall 2011
<br />112011 Prellminerytlesign
<br />Subtotal
<br />S4.4CO
<br />573,225
<br />$202,375
<br />S
<br />220,000
<br />Food StimIce Improvementa
<br />B.v Ay 11115 Elementary
<br />Kmhen Hood Moid.fiwhons
<br />F.S. Consultant
<br />51.000
<br />52.500
<br />S40.500
<br />SG2,28
<br />$15.723 $
<br />50,000 811512011
<br />n
<br />9002011 Contract Pendl 0
<br />:
<br />CoWne4Wbb- Hamn+ntary
<br />Kiichen- Hootl- 0.rwA.l.catwrrs
<br />F.SSon6uliant
<br />$s.m
<br />U2 &Osi
<br />846.500
<br />$0
<br />$46.500
<br />00 Zff�:'
<br />5500 11m'
<br />° .
<br />Me Popa-1, Middle School
<br />Kartnm Hn y Klml hoauotts
<br />F.S Consulann
<br />51.600
<br />52.500
<br />540.500
<br />$56.930
<br />510.2.0 S
<br />50.000 8152011
<br />9,9 &2011 Contract Perdln
<br />R.8rowrI)AcAlisler Elam
<br />Kerherl Hood Modfiratrons
<br />F.S. C- -Blanc
<br />$1,000
<br />52.5DO
<br />546,500
<br />565.208
<br />516.700 S
<br />50. 003 8
<br />9!30!2071 Contract Pending
<br />Subtotal
<br />$4.000
<br />510.003
<br />$186,000
<br />5184,36E
<br />51,634 $
<br />200,000
<br />
|