Laserfiche WebLink
December 5, 2011 (Work Session) Page 882 <br />Site Development <br />Pace Analytical <br />4,030.00 <br />4,030.00 <br />NC DENR <br />8,086.00 <br />6,086.00 <br />Cabarrus County Commerce <br />213.37 <br />213.37 <br />Agri -Waste Technology <br />34,174.96 <br />34,174.96 <br />Total Funding Needed <br />46,504.33 <br />46,504.00 <br />0.33 <br />Well Water Supply <br />75,000.00 <br />75,000.00 <br />- <br />75,000.00 <br />Waste Water Construction <br />385,000.00 <br />385,000.00 <br />341,971.00 <br />43,029.00 <br />Total Funding Needed <br />1,584,046.06 <br />1,398,753.00 <br />185,293.06 <br />Revenue Shortfall <br />Estimated <br />and <br />Contracted <br />Cost <br />Current <br />Budget <br />Budget <br />Shortfall <br />• Donations - Cruse Meats <br />1 20,000.00 <br />(20,000.00) <br />• Management Agreement with Cruse Meats does not call for this contribution. <br />205,293.06 <br />75,000.00 <br />General Fund <br />130,293.06 <br />Farm Budget <br />205,293.06 <br />She advised that the project's individual budgetary line items and <br />contracts were scrutinized and that addition funding is needed in several <br />areas. She advised the $385,000.00 previously approved by the Board for the <br />waste water system did not include the well water system. However, she <br />advised the cost of the well water system, $75,000.00, can be included in the <br />Management Agreement with Cruse Meats and recouped over time. Further, she <br />advised the $20,000.00 donation from Cruse Meats was removed from the budget <br />because the company will purchase equipment instead. The net change to the <br />budget was identified as $205,293.06. <br />Kyle Bilafer, General Services Director, addressed the technical need <br />for the change orders, noting that contingency funds were not included in the <br />construction contract. He advised the bulk of the change orders related to <br />electrical upgrades for the harvest facility, the waste water treatment <br />facility and the well water system. <br />A lengthy discussion ensued with Mike Downs, County Manager, Ms. Dubois <br />and Mr. Bilafer responding to a number of questions from the Board. <br />UPON MOTION of Commissioner Carruth, seconded by Commissioner Measmer <br />and unanimously carried, the Board voted to place "Finance - Budget Revision <br />to Update Estimated Cost for the Cruse Meats Project and Update the Overall <br />Budget for the Incubator Farm - $82,772.00" on the December 19, 2011 Agenda <br />as a Consent item. <br />Sheriff's Administration Building - 7 Floor Upfit Project Update <br />Kyle Bilafer, General Services Director, presented an update on the 7th <br />Floor Upfit Project at the Sheriff's Administration Building. The top floor <br />shell is being renovated for classroom space for law enforcement, EMS <br />(Emergency Medical Services), etc. He reviewed the following floor plan and <br />advised the design includes everything the Rowan Cabarrus Community College <br />(RCCC) Basic Law Enforcement Training program requires with the exception of <br />physical training for the physical training test. <br />