July 2, 2007 (Work Session) Page 487 <br />and came back with the following recommendations: (1) to send individual <br />letters to affected property owners in addition to running a newspaper <br />advertisement; and (2) to not establish a refund policy. He further reported <br />the Board approved both recommendations; the Board declined to take action on <br />the refund request; the Commerce Director was asked to draft a response to <br />Mr. Smith outlining the actions of the Planning Commission and County <br />Commissioners; but since another request was received from the property <br />owner, the Board can take some action, if it chooses to do so. <br />Commissioner Mynatt seconded the motion. The MOTION failed with <br />Commissioner Mynatt and Privette voting for and Chairman Carruth, Vice <br />Chairman Juba and Commissioner White voting against. <br />Recess of Meetin <br />Chairman Carruth called for a short recess at 9:99 p.m. The meeting <br />reconvened at 5:01 p.m. <br />NCRC TIF Project List <br />Mike Legq, Kannapolis City Manager, reviewed the TIE Project list. <br />Nate Dolittle of Land Design, was also present. Note: A complete project <br />list is hereby incorporated by reference - see Minute Book 30 Attachment No <br />1. <br />Utilities - U-1 Main Street 12-Inch Water Main; U-2 24-Inch & 16-Inch Water <br />Main relocation along Dale Earnhardt Blvd., Oak Avenue and "A" Street; U-3 <br />30-Inch Water Main Re-activation; U-5 30-Inch Water Main Relocation; U-6 <br />Project C: Cannon Village Infrastructure Improvements; U-7 On-Site Campus <br />Phase 1 Public Utility Systems; U-8 On-Site Campus Phase 1 Roadway Network; <br />U-9 On-Site Campus Phase 1 Internal Intersection Signals; U-10 Pedestrian <br />Tunnel & Stormwater Improvements at the 8t" Street Greenway on Loop Road; U-11 <br />Pedestrian Tunnel & Stormwater Improvements at Village Park; U-12 On-Site <br />Campus Phase 2 Public Utility Systems and U-13 On-Site Campus Phase 2 Roadway <br />Network. <br />Streetscaping - S-1 Project B: Loop Road at NC 3 (Mooresville Road) Roadway <br />Improvements; S-2 North Main Street from Eirst Street to North Loop Road; S-3 <br />S-9, S-5, S-6, S-7, S-8, On-Site Campus Phase 1 Streetscape Improvements; S-9 <br />Project D: North Loop Road Streetscape (from North Main to West "C" Street; <br />5-10 Project E: South Loop/Dale Earnhardt Blvd. Streetscape (From Vance to <br />South Main); S-11 Glenn Avenue Road Improvements; S-12, 5-13, S-19 On-Site <br />Campus Phase 2 Streetscape Improvements and 5-15 South Main Street from First <br />Street to Dale Earnhardt Blvd. <br />Traffic Improvements - T-1 Intersection Improvements Ridge Avenue/First <br />Street/Main Street; T-2 Interchange Improvements I-85 at Lane Street; T-3 <br />Intersection Improvements US 29/601 and Dale Earnhardt Blvd. (NC 3); T-4 <br />Mooresville Road Widening from Loop Road to Kannapolis Parkway; T-5 and T-6 <br />Closed Loop/Computerized Signal System and Signal Feasibility Study; and T-7 <br />Intersection Improvements US 29/601 and Jackson Park Road/Lane Street; T-8 <br />Universal Street and Ridge Avenue and T-9 Oakwood Avenue. <br />Parks and Parking Decks - P-1 Core Campus Park A; P-2 Campus Park B; P-3 <br />Veterans Park Improvements; P-4 8`" Street Landfill Park and Ballfields; P-5 <br />Stream Restoration/Greenway Construction; C-3 Parking Deck RCCC and D-1 <br />Parking Deck UNC/NC State. <br />Mr. Legg and Mr. Dolittle responded to questions from the Board <br />throughout the presentation and a general discussion ensued. <br />After discussion, the Board identified the following projects for <br />inclusion on the TIF project list: A. L. Brown wing addition, Fishertown <br />sewer project, Senior Center, Library, and a new Northwest area high school <br />science wing. <br />UPON MOTION of Commissioner White, seconded by Commissioner Mynatt and <br />unanimously carried, the Board voted to place the TIF Project List on the <br />July 23, 2007 Agenda as a New Business item. <br />Solid Waste Franchise Acreement - Contract Renewal Update <br />Pam Dubois, Deputy County Manager, presented information on the <br />modifications to the Solid Waste Franchise Agreement, which is up for renewal <br />at the end of the year. The addition of curbside recycling was identified as <br />