Laserfiche WebLink
CABARRUS COUNTY DEVELOPMENT ORDINANCE <br />CHAPTER 16 -FLOOD DAMAGE PREVENTION <br />certificate data submitted. Deficiencies detected by such review shall be corrected by the permit holder <br />immediately and prior to further work being permitted to proceed. Failure to submit the certification or <br />failure to make required corrections shall be cause to issue a stop -work order for the project. <br />(iii) Afinal Finished Construction Elevation Certificate (FEMA Form 096-0.33) is required after construction is <br />completed and prior to Certificate of Compliance/Occupancy issuance. It shall be the duty of the permit <br />holder to submit to the Floodplain Administrator a certification of final as -built construction of the <br />elevation of the reference level and all attendant utilities. The Floodplain Administrator shall review the <br />certificate data submitted. Deficiencies detected by such review shall be corrected a permit holder <br />immediately and prior to Certificate of Compliance/Occupancy issuance. In instances, another <br />certification mayberequirecito certify corrected as -built construction. Failure ubmit the certification <br />or failure to make required corrections shall be cause to withhold the <br />is <br />nce of a Cal ate of <br />Compliance/Occupancy. The Finished Construction Elevation Certificate certi hall provide east 2 <br />photographs showing the front and rear of the building taken from t ate of <br />certification. The photographs must betaken with views conflrmi ebw des ddiagram <br />number provided in Section A. To the extent possible, these pho raphsshou ow the entire building <br />including foundation. If the building has split-level or multi -le areas, provi at least 2 additional <br />photographs showing side views of the building. In addition, wh pplicable, ide a photograph of <br />the foundation showing a representative example of oP or v . All photographs must <br />be in color and measure at least 3 x 3. Digital pho phs a to <br />(b) Floodproofing Certificate <br />(i) If non-residential floodproofing is use eat the Regulathq.Ed Protection Elevation requirements, <br />a Floodproofing Certificate (FEMA 096-0.34), with suP ming data, an operational plan, and an <br />inspection and maintenance pla wired prior to the actual start of any new construction. It shall <br />be the duty of the permit er to it to the Floodplain Administrator a certification of the <br />floodproofed design eleva ' ofthe refer level and all attendant utilities, in relation to NAVD 1999. <br />Floodproofing certifica' hall be repared under the direct supervision of professional engineer <br />or architect and cern y sa The Floodp in Administrator shall review the certificate data, the <br />operational plan, and th ion and maintenance plan. Deficiencies detected by such review shall <br />be corrected the applica nor to permit approval. Failure to submit the certification or failure to <br />make requir 4{mons shat auseto deny Floodplain Development Permit. Failure to construct <br />in accordance 'th 4Nt# ortifled slim shall be cause to withhold the issuance of a Certificate of <br />(ii) i gal hed COSI ruction Floodproofing Certificate (FEMA Form 086-0.34), with supporting data, an <br />eratio plan, a an inspection and maintenance plan are required prior to the issuance of a <br />'fi ce/Occupancy. It shall be the duty of the permit holderto submit to the Floodplain <br />A trator a certification ofthe floociproofed design elevation ofthe reference level and all attendant <br />tiliti relation to NAVD 1988. Floodproofing certificate shall be prepared by or under the direct <br />N pervisi f a professional engineer or architect and certified by same. The Floodplain Administrator <br />s review the certificate data, the operational plan, and the inspection and maintenance plan. <br />D ,review <br />detected by such review shall be corrected by the applicant prior to Certificate of Occupancy. <br />i ure to submit the certification or failure to make required corrections shall be cause to deny a <br />oodplain Development Permit. Failure to construct in accordance with the certified design shall be <br />cause to deny a Certificate of Compliance/Occupancy. <br />(c) If a manufactured home is placed within Zone AE and the elevation of the chassis is more than 36 inches in <br />height above grade, an engineered foundation certification is required in accordance with the provisions of Part <br />5, Section B(3)(b). <br />(d) If a watercourse is to be altered or relocated, a description of the extent of watercourse alteration or relocation; <br />a professional engineer's certified report on the effects of the proposed project on the flood -carrying capacity <br />12 <br />Page 210 <br />